The Buried Road Discovery
A highland survey uncovered shell-bearing paving beneath the glacier.
What happened
The paving resembled drawings of foundations beneath Highby. A road connecting those locations would cross both political borders and the accepted chronology of the transfer network. Tarin marked the route but turned back before the ice closed, choosing a recoverable discovery over an unreturning expedition.
Where to look
The event is anchored at The Frost Skyline. Related witnesses and institutions appear in the connections rather than being treated as a detached chronology.
An eastern wall of ridges with a road older than the ice above it.
Tarin found shell-bearing paving under high ice and recognized the pattern from a pilot’s drawing of Highby.
Miren leads the winter supply train herself, carrying medicine in the warm space beneath her coat.
Independent listeners heard a child asking to go home inside the fortress cedar.
Surveyors found warm water beneath old ice and collected the jar now examined in Garnetrun.
The tidekeeper ordered a precautionary evacuation before the next unscheduled opening upstream.